Thinkfinity Labs

PCB Design & Prototyping

We route precision high-speed, multi-layer schematics, and layouts, conducting detailed signal integrity audits and delivering rapid functional prototypes for field testing.

PCB Layout Pain Points

Inadequate PCB design practices can cause project failures:

  • Signal Noise & EMI: Cross-talk between high-frequency traces and analog lines.
  • Thermal Hotspots: Poor heat dissipation burns out power regulators.
  • Non-Manufacturable: Tight tolerances lead to high PCB fabrication reject rates.
  • Component Shortages: Selecting obsolete packages delays assembly.

Thinkfinity DFM Layouts

We apply strict Design for Manufacturing (DFM) rules:

  • Impedance Tuning: Calculated differential traces matching RF requirements.
  • Thermal Vias: Optimized copper pours and thermal vias for dissipation.
  • Active DFM Audits: Checking layout against manufacturer capabilities.
  • Dual Sourcing BOM: Mapping multi-vendor alternate components.
EDA Software & Formats

Layout Environments

Altium Designer

Industry standard for high-speed multi-layer layouts

Autodesk Eagle

Ideal for lightweight modular iot designs

KiCad

Open-source design files for active client handovers

EasyEDA

Fast turn-around simple routing tasks

Routing Capabilities

PCB Specifications

  • Layer Stackups: 2-layer, 4-layer, 6-layer, and up to 12-layer high-density interconnect (HDI) boards.
  • Rigid & Flexible PCBs: Rigid-flex stackups for space-constrained enclosures.
  • Signal Routing: Impedance-controlled traces for USB, Ethernet, DDR, and RF lines.
  • Rapid Prototyping: SMT component pick-and-place assembly inside our lab for quick sample rounds.
FAQ

PCB Design FAQs

What file formats do you deliver? +

We deliver comprehensive hardware packages including schematic source files, layout files (Altium, KiCad, or Eagle format), manufacturing Gerber files (RS-274X or ODB++ format), assembly Pick-and-Place coordinates, and the complete Bill of Materials (BOM) containing vendor sourcing links.

How fast can you deliver prototype boards? +

For standard 2-layer or 4-layer layouts, we can complete routing and assemble initial test prototypes within 2 to 3 weeks using local rapid PCB fabrication houses and our in-house lab assembly tools.

Get Started

Route Your Hardware Circuitry Correctly

Consult with our layout specialists in Bengaluru to start your PCB design project.

Request PCB Design Proposal